Analysis of Cost & Schedule Overrun in Construction Projects
Authors Name:
Prof. Pranay Khare
, Pravin Waykar , Sanket Padir , Amit Kamble , Prathamesh Rasal
Unique Id:
IJSDR1805115
Published In:
Volume 3 Issue 5, May-2018
Abstract:
The aim of the present study was to investigate the increasing frequency of cost and time overruns on construction projects, and to provide recommendations for addressing the situation.Identification of the distribution and trends of the cost overruns and time delays of contracts.Analyses for identifying the factors that significantly influence cost overruns and time delays.To rank causes of cost and schedule overrun based on their frequency index, severity index ad importance index.To check accuracy of collected data using statistical method. Implementation of EVM method to check performance of the project.To assess which causes need the most attention by stakeholders.
Keywords:
-
Cite Article:
"Analysis of Cost & Schedule Overrun in Construction Projects", International Journal of Science & Engineering Development Research (www.ijsdr.org), ISSN:2455-2631, Vol.3, Issue 5, page no.751 - 753, May-2018, Available :http://www.ijsdr.org/papers/IJSDR1805115.pdf
Downloads:
000337209
Publication Details:
Published Paper ID: IJSDR1805115
Registration ID:180358
Published In: Volume 3 Issue 5, May-2018
DOI (Digital Object Identifier):
Page No: 751 - 753
Publisher: IJSDR | www.ijsdr.org
ISSN Number: 2455-2631
Facebook Twitter Instagram LinkedIn